Arianespace - Press Release - Arianespace launch 195 – Arabsat-5A and COMS
Kourou, June 26, 2010
In the two synchronized sequences performed during the launch countdown on Thursday, June 24, an atypical pressure value was observed in the pressurization system of Ariane 5’s cryogenic main stage.
After precise analysis of this phenomenon, and complementary checks were carried out, Arianespace has decided to resume final countdown operations for Flight 195 with the Arabsat-5A and COMS satellite payloads.
Kourou, June 26, 2010
In the two synchronized sequences performed during the launch countdown on Thursday, June 24, an atypical pressure value was observed in the pressurization system of Ariane 5’s cryogenic main stage.
After precise analysis of this phenomenon, and complementary checks were carried out, Arianespace has decided to resume final countdown operations for Flight 195 with the Arabsat-5A and COMS satellite payloads.
No comments:
Post a Comment